Earth Electrical
  • Home
  • EV Chargers
    • Home EV Charger Installation
    • Workplace EV Charger Installation
    • OLEV Grants
  • Home Electrical
    • Rewiring
    • Lighting
    • Sockets
    • Fuse Boards
    • Electrical Inspections
  • About
  • Blog
  • Contact Us

Electric Vehicle charging point installs week 23 2020

Published by Andy Parker on 8th June 20208th June 2020

total of 14 home charging units installed this week

9 x Rolec EVHS2020 untethered 32A 7.4KW

5 x Rolec EVHS21400 tethered 32A 7.4KW

The installs of the car charging points took place in southwood, tilehurst, medstead, esher, pirbright, elstead, eversley and blackwater

Categories: Uncategorised

Recent Posts
  • Grant funded EV Charging point installation week 2 2021
  • Earth Rods
  • Feedback Jan 2021
  • EV Charging point installation week 1 2021
  • Feedback Jan 2021

Related Posts

Uncategorised

Grant funded EV Charging point installation week 2 2021

During week 2 2021 we installed 13 electric vehicle charging points 8 X ROLEC EVHS2020 homesmart units (untethered 32A 7.4KW) 5 X Rolec EVHS214O homesmart charging units (tethered 32A 7.4KW) The installations of car charging Read more…

Uncategorised

Earth Rods

Earth rods are fine to use on their own and give a physical return path should your supply neutral become open circuit Below is the long form explanation:If an installation has a PME OR TNS Read more…

Uncategorised

Feedback Jan 2021

Hi AndrewJust wanted to say thanks to both of you for a first class service. I will certainly recommend you when friends change to EV’s. Very professional from start to finish.Kind regardsStuart 

Earth Electrical logo
  • Earth Electrical (Southern) Ltd
    29 Oaken Copse Crescent
    Farnborough
    Hampshire
    GU14 8DS
  • Company No 7263326
    VAT no 993 9589 31
  • 01252 856 498
  • 07961 915 878
Quick Links:
  • Home
  • Home EV Charger Installation
  • Workplace EV Charger Installation
  • Home Electrical
  • About
  • Contact Us
  • Cookie policy (UK)
  • Privacy Policy
Recent blog posts:
  • Grant funded EV Charging point installation week 2 2021
  • Earth Rods
  • Feedback Jan 2021
  • EV Charging point installation week 1 2021
  • Feedback Jan 2021
  • EV Charging Point Installations week 52 2020

© Earth Electrical (Southern) Ltd 2019. All rights reserved.
Design by Southern Web Design